Energy Plantrooms
BSH has been providing offsite fabrication facilities for almost three decades. Our pre-packaged plantrooms offer a plug and power solution to businesses for essential building services including heating and cooling.
We also provide a range of bespoke site assembled buildings.

Plantroom Specifications
Our unique plantrooms are available in different specifications to ensure conformation with regulation compliance for planning, environmental and health and safety.
BSH hybrid and bivalent heating systems combine conventional fuels with sustainable future fuels to help reduce carbon emissions for customers whilst providing efficient and reliable heating and cooling.
Got a project in mind?
Energy Plantrooms designed to order
-
Pre-erection assembly
BSH is able to carry out pre-erection of your modular system in a controlled environment off-site. Our pre-erection assembly service makes construction a rapid process, minimising down time at your plant or organisation as well as reducing costs due to the quick hook up and commissioning of the system once we are on site. Our processes mean that we can shave weeks off modern work programs.
-
Tailored Systems
Each of our plantrooms is tailor made to match the space available as well as tailored to your fuel needs. We can design a combination fuelled system that includes heating, cooling, combined heat and power, domestic and control systems, as per your requirements. Each system is designed to meet the individual needs of a building, with your specific requirements met to maximise performance and efficiency.
-
Modular build for transport by road
Fire rating if necessary
Insulated
Noise attenuating
20 year warranty on cladding
The largest plug and power plantroom manufactured by BSH is 12m (long) x 3.5m wide x 3m high for Rolls Royce.
The largest plug and power plantroom in terms of power is 1.4Mw thermal which was manufactured for a local council in Scotland.
BSH holds the accolade for the largest trigeneration plant room in Europe in 2012 which was designed and build for Tesco in Naas, Co. Kildare, Ireland.
-
Reduced risk of fire and gas leaks to main building
Quick and easy maintenance of operations
Can accommodate multi fuel systems (gas, hybrid etc)
Rapid installation due to numerous components being erected off site
Ensured quality control with all work inspected prior to delivery
Easily integrated into your existing system or used as a stand alone
Easy on site access independent from the main building
Lead times can be as little as 8 weeks from order and final design approval.
Environment control of plant area
Our clients include: